Programme Dashboard
AURA Maldives MVAC Installation Programme —
Client: JD Dhigu Dhefaru Pvt Ltd ·
Combined value: $981,670 ·
Duration: Feb 2026 – Jun 2027
Cumulative Progress — Planned vs Actual
Installation Progress by Building 0%
Readiness Pipeline 0 buildings
Material Supply Chain
Progress by Phase
Next Actions Urgent items
Upcoming Payment Milestones
| Invoice | Contract | Description | Amount | Status |
|---|
Site Readiness
Is each location physically ready for MVAC installation? Tick every item before assigning a team.
Readiness gates team assignment. A team can be assigned only once a location’s checklist is complete.
Readiness is site-readiness only — it is independent of material delivery, so teams mobilise and start with
currently-supplied materials before the balance arrives.
Drawing Sets
MVAC drawing PDFs for site reference. Tap any sheet to open it in your device’s PDF viewer — lightweight, no zone processing.
Correspondence
Formal client letters on the Nimmin letterhead — RFI, RFA, Site Instructions, NCR, transmittals & general letters, with a tracked register.
| No. | Type | Subject | To | Date | Status |
|---|
EOT / Claims Register
Extension-of-time and cost claims — notice, particulars deadline, determination. FIDIC-style: late particulars can time-bar the claim.
| Ref | Type | Title / cause | Notice | Particulars due | Days | Amount | Status |
|---|
Buildings Register
All structures by zone with readiness state and progress
| Building | Zone | Units | State | Team | Progress | Action |
|---|
Drawings
MVAC layout drawings per building — uploaded PDFs & images for zone detection and scope
Pre-Commissioning — VRV Systems
Daikin service handover checklist per system: 22 checks, nitrogen pressure test and vacuum test records. Print the Nimmin report or send it to the client portal as an inspection.
Work Scope
Per-equipment installation progress, built from detected drawing zones — rolls up to the building & dashboard
Takeoff & Reconciliation
Per-building materials (BOQ) + equipment counts cross-checked against drawings (PDF/CAD)
Materials
Procurement & stock ledger reconciled against the BOQ — what to order, what's pending, what's on site
| Material | Unit | Required | Ordered | Delivered | Used | Available | To Order | Pending | MAR | PO # | Status |
|---|
Commercials
Contracts, invoices, variations & milestone billing
Invoicing by Contract
Programme Schedule
Critical-path schedule computed from the task register — linked to live site progress
0% overall
Phases
Tasks — CPM Gantt red = critical path · 🔗 = auto-driven by site data · click ✎ to edit
Schedule Summary
My Work
Your team’s buildings — tap a step to update progress, add photos as you go
Progress Claims — Contract Programme
SP2 labour programme — earned value auto-computed from site scope data, bill weights per the agreed claim basis
S-Curve — planned vs earned planned = bill-weighted baseline · earned = certified claimable progress
Activity register — plan vs actual 🔗 = auto from site scope · type in the Done % column for manual activities
Installation Schedule — By Building
Planned window per building vs live installation progress (plan % assumes linear progress across the window). PM / admin assign teams and set start + duration (finish auto-adjusts); progress comes from site data.
| Building | Zone | Team | Planned Start | Planned Finish | Duration | Plan % | Actual % | Δ | Status |
|---|
Task Register
Execution task register — 56 sub-tasks across 8 phases (WBS 0–7)
0% complete
Project Team
Key personnel assigned to the project — PM, Site Supervisor, QA/QC and others (separate from install teams)
Install Teams
Create groups, add people, assign teams to ready buildings
Snag List
Defects and punch list items logged during installation
No Snags Recorded
Installation has not started yet. Snags will be logged once on-site works begin.
User Management
Nimmin spine users (shared with the HR app) — one login across all apps. Aura Role controls rights here.
| Name | Division | HR Role | Aura Role | Commercials |
|---|